Soft PVC USB drive casings moulded as locomotive shapes, shown in four variants

The five stages

  1. Artwork evaluation. We review your file or sketch and return a 3D model and a quotation. Usually within one working day.
  2. Tooling. The mould is cut and tested. Time depends on geometry and cavity count.
  3. Sampling. A pre-production sample is made and shipped for your approval — 5–7 days after artwork approval.
  4. Mass production. 12–30 days after artwork approval, depending on quantity and complexity.
  5. Shipping. Sea or air freight to your destination; quoted separately by volume and port.

The headline numbers

Sampling: 5–7 days. Production: 12–30 days. Both are measured after artwork approval — the single biggest variable is how fast you approve artwork and sample, not how fast we make.

What shortens the timeline

  • Approving artwork and sample promptly.
  • Providing a vector file and Pantone references up front.
  • Choosing standard materials and finishes.
  • Confirming quantity and destination early so freight is booked with production.

What lengthens it

  • New artwork or changes after sample approval (re-tooling).
  • Custom compounds, special finishes or certification documents.
  • Peak-season factory load and customs clearance at destination.

See the sampling guide and the order process for the steps in detail.

FAQ

What is the total time from enquiry to delivery?
A typical project runs 3–6 weeks including sampling and production, plus freight. Enquiry-to-sample is 5–7 days; production 12–30 days after approval.

Does production really start after approval?
Yes. Both sampling and production clocks start at artwork approval, so approving quickly is the main lever.

Can you rush an order?
Tell us the hard deadline and quantity; we will say what is achievable, including air freight, and quote it.

Is shipping included in the lead time?
No. Freight is quoted separately by destination and volume; sea is slower and cheaper, air is faster.

Minimum order and lead time?
100 pieces per design; sampling 5–7 days; production 12–30 days after artwork approval. Free 3D modelling before tooling.

More buyer's guides